BAU, Munich

Architecture, building materials and construction systems.

Venue
Messe München
City
Munich
Delivery
Germany
Courier, working days
2

What a stand usually needs

  • Fabric walls

    The backdrop of the stand. An aluminium frame with tensioned fabric. Two people assemble it without tools and it goes back into its case for the next show.

    Lead time: 5-7 days
  • Flags and A-frames

    What people see from the aisle before they reach the stand. Wind flags outside the hall, A-frames at the entrance, masts in the car park.

    Lead time: 4 days
  • Presentation folders

    The wrapper for the offer you hand over at the stand. Board 300-350 g, because thinner stock curls in a bag before the visitor reaches the exit.

    Lead time: 5-6 days
  • Catalogues

    A product or company catalogue, sixteen pages and up. Binding follows block thickness, not taste: under a 4 mm spine perfect binding does not hold.

    Lead time: 7-10 days

How far ahead to order

Working days before opening: production, one day to approve the proof and the courier to the country of the show. No dates here, because you are the one who knows the opening day: put it into the calculator below and you get the deadline with public holidays on both sides of the border.

ItemProductionCourierBefore opening
Fabric walls7211
Flags and A-frames428
Presentation folders6210
Catalogues10214

The maths assumes delivery the day before opening, inside the build-up window. Anything shorter is express, so call us.

DIN 4102 B1

All wall fabrics and materials carry a DIN 4102 B1 certificate (schwer entflammbar). The certificate travels in the box: nobody has to forward it or dig it out of an inbox on build-up day.

Reprint in 24 h

Damage during build-up: reprint and delivery to the stand within 24 h. Call, do not write.

+48 732 129 024

The questions that come up most

FAQ
How far ahead should I order materials for BAU?

11 working days before opening if you are ordering fabric walls: 7 days of production, one day to approve the proof and 2 days for the courier. We do not print an exact deadline date here, because the organiser sets the opening day and can move it. Put your date into the calculator on this page and we count it with public holidays on both sides of the border.

When do you deliver materials for BAU?

Into the build-up window, not on the opening day: normally the day before opening, so the stand has the full set before assembly. You give us the build-up date at Messe München in the order and we aim at it, not at somebody else's calendar. If the organiser moves it, we change the delivery by phone, without rewriting the order.

Do you deliver to the stand number at Messe München?

Yes, to the stand number, not to the venue reception. Hall and stand number are a field in the order rather than a note in an e-mail, so they travel with the shipment. For larger builds our own crew comes in and puts the set up on site.

What fire certificate do I get for BAU?

A DIN 4102 B1 certificate for the fabrics and wall materials, on paper, in the same box as the print. The venue safety officer asks for it when signing off the build, so nobody has to dig it out of an inbox on build-up morning.

Deadline

Your event has a date nobody will move.

Give us the opening date and what you are ordering. We count the order deadline backwards, with working days, public holidays on both sides of the border and courier time.

Without JavaScript the widget does not calculate dates. The table below gives the production time of every item in working days; add one day for proof approval and the courier: one day in Poland, two in Germany.

ItemWorking days
Fabric walls7
Roll-ups3
Flags and A-frames4
Conferences and events6
Banners3
Posters2
Wall murals5
Stickers3
Business cards3
Leaflets3
Letterheads4
Invitations4
Catalogues10
Reports and brochures5
Presentation folders6
Packaging8
Calendars14
Planners and notebooks7

Express 24 h for walls, roll-ups and digital print. The surcharge is agreed at quotation and confirmed by phone before we take the job.

Quotation

Give us the opening date. We count the rest.

We answer within 24 hours on working days. If the deadline is tight, call: that is faster than a form.

Format, quantity, substrate, deadline. The more specific, the faster the quote.
Works without JavaScript.